PixelOS | Android 17
Device: Poco F8 Pro / Redmi K90 ( annibale )
Updated: 26/09/2026
By: @ramshell688
▪️Download
▪️Installation
▪️Support
▪️Screenshot
Changelog:
• Fixed display color settings.
• Switch to QTI vibrator service.
• Adjust status bar padding.
• Bring back Dolby Atmos and Dolby Vision.
• Added camera libs from OS3.0.303.0.WPKCNXM.
• Update blobs to OS3.0.301.0.WPKMIXM.
• Upstream kernel to 6.6.118.